At Mozyr HPP a 70 MW gas turbine (with 65-80 MW electric capacity) is to be arranged as a waste heat disposal circuit with a built-in unit at the existing steam power equipment. Due to the inculcation of new technologies specific expenditure of fuel will decrease and electric power generation will increase. Delivery of equipment is preferable from Germany, Switzerland, Russia.
联系人:
联系电话:
联系邮箱: